Deliverables

The deliverables are perserved at DTU data ESOMOOR project.

WP1 — Reporting and knowledge community

  1. D1.1
  2. D1.2
  3. D1.3

WP2 — Life-time engineering assessment

  1. D2.1

    Energy harnessing and life cycle performance (LCP) of FOWFs

  2. D2.2

    Recommendations and strategies for LCOE reduction

WP3 — Base design

  1. D3.1
  2. D3.2a
  3. D3.2b
  4. D3.3

    Summary report on design optimization of shared-mooring FOWFs

  5. D3.4

    Numerical simulation models for the optimized designs

WP4 — Material tests for ropes

  1. D4.1

    Definition of selected mooring ropes for both polyester and polyamide types

  2. D4.2

    Stiffness data from tests for both polyester and polyamide ropes

  3. D4.3.1

    Simplified visco-elasto-plastic model for mooring analysis

  4. D4.3.2

    Summary report of development of future technology qualification of rope materials and tests, and scaling of a lab- to full-scale

  5. D4.4

    The mesoscopic model; identification, validation, and its possible application as a numerical tool for the mooring rope design

WP5 — Tool development

  1. D5.1

    Extended MoorDyn solver and validation report

  2. D5.2

    Validation report for the extended MIKE 21 Mooring Analysis solver

  3. D5.3

    Reduced-order models and validation report

  4. D5.4

    Recommendations on the use of reduced-order models for FOWF with shared mooring

WP6 — Simulation, investigation, and optimization

  1. D6.1

    High-fidelity CFD models and summary report on scale effects

  2. D6.2

    Validation report of mid-fidelity models

  3. D6.3

    Summary report on safety, redundancy, and efficiency

  4. D6.4

    Recommendation of optimized cable layout model which reduces fatigue damage

  5. D6.5

    Summary report on integrated mooring-cable design

WP7 — Tank test

  1. D7.1

    Tank test report – UPM, model test data

  2. D7.2

    Tank test report – DHI, model test data

WP8 — O&M, environment

  1. D8.1

    Summary report underwater environment impact due to FOWFs

  2. D8.2

    Recommendation on the use of ROMs to plan O&M activities

  3. D8.3

    Summary report on the feasibility of using ultrasound to clean biofouling in FOWFs